If they're still interested, ask if they can deliver the estimate to you within two to five days. This accomplishes two things: It reinforces that you're a serious, valuable customer, and it demonstrates that you'll be clear and reasonable about what you need to be happy if you were to move forward together.
How do you ask for a construction quote?
- Supply definitions of the products or services required with detailed specifications.
- Include Quantities.
- Specify expected delivery date.
- Ask if the items are held in stock and are an exact match.
- Include a location of the proposed delivery.
- Specify an expected reply date for the request.
How many quotes should you get for a construction project?
It is a good idea to get three renovation quotes from different providers before deciding which interior design firm and contractor to work with. Getting a building quote provides an estimate of a renovation project's cost based on the materials used and the design work intended.
What to ask a builder when getting a quote?
- What experience do you have with my kind of project?
- Are you accredited?
- Can I see some finished projects?
- Can I see a project in progress?
- Do you have references and reviews?
- Is your price a quote or estimate?
- Do you have insurance cover?
Should you pay a contractor for a quote?
Do Contractors Charge for Estimates? In many cases, a contractor will not charge for an estimate on smaller jobs like painting, window washing, or lawn services. If the work is simple and doesn't require in-depth consultation or design work, estimates are generally free of charge.
What does quote mean in construction?
A quote is a figure that a contractor gets from a supplier for the price of materials they need for a job. Quotes are often only good for a certain period of time––generally about a month––which means the builder has only that amount of time to buy the materials at the given price.