A Construction Change Directive is a directive issued by the owner or client to the contractor that authorizes a change in the project scope, schedule, or other contract terms. CCDs are typically employed when there is an urgent need for a change, but time does not allow for a formal Change Order process.

What is a change directive in construction?

A construction change directive (CCD) is effectively a command to a contractor to change their work on the project. When a contractor is given a change directive, it is essentially an order: The contractor must follow the changes without any input. Change directives are also known as “force account work.”

What is the purpose of a change order in construction?

A change order is a document used to alter the original agreement on a construction project. It details the changes in the scope of work, cost, and schedule that are required. In many instances, the construction contract dictates the change order process.

What is the difference between a site instruction and a change directive?

The difference between a site instruction vs. change order is found in the way they are communicated. Where change orders are written documents of the change signed by the general contractor and the subcontractor, a site instruction is purely given by the GC.

How do you avoid construction change orders?

Below are some tips for reducing or eliminating unwanted change orders on construction projects.
  1. Ensure a clear project scope.
  2. Provide clear project specifications.
  3. Perform a detailed constructability.
  4. Avoid the “silo conundrum.” Nearly every project includes work elements designed by different disciplines.

What is a field directive in construction?

A field work directive can instruct contractors to complete additional work, correct unacceptable work, or perform emergency work. A field work directive is sometimes referred to as a field order, or a work directive.

What is a CCD architecture?

When the owner and contractor are not able to agree on changes, a CCD can be made by the owner and the architect. The CCD directs the contractor to make the requested change in lieu of this agreement.

Frequently Asked Questions

What is the difference between a construction change directive and a change order?

A change directive or force account work is not the same thing as a change order. A change order requires agreement from the owner and other parties involved. A change directive is used to direct the contractor to perform additional work when there is not an agreement between the owner and contractor.

What are the three types of CCD?

Three basic variations of CCD architecture are in common use for imaging systems: full frame, frame transfer, and interline transfer (see Figure 7).

Can a construction change directive be issued by the owner without the agreement of the contractor?

Change directives aren't an agreement or a request to make a change — they're mandatory. Change directives are literally a direction, given by an owner, that a contractor must abide by. Often, a change directive will follow a disagreement between the owner and the contractor.

What is a construction change directive?

A construction change directive (CCD) is effectively a command to a contractor to change their work on the project. When a contractor is given a change directive, it is essentially an order: The contractor must follow the changes without any input. Change directives are also known as “force account work.”

Can a construction change Directive be issued by the owner without the agreement of the contractor?

Change directives aren't an agreement or a request to make a change — they're mandatory. Change directives are literally a direction, given by an owner, that a contractor must abide by. Often, a change directive will follow a disagreement between the owner and the contractor.

What is ccd in construction

Oct 7, 2021 — What is a Construction Change Directive (CCD)? ... A construction change directive, or CCD, is a command to a contractor to change their work on a 

What is an example of a change order in construction?

Classic examples of change orders include the owner's desire to move the location of a wall to accommodate some other design element, adding a window where there was none in the original plans, or changing the finish of the floors from tile to terrazzo.

How do you create a change order?

Change Order Process
  1. Review the Contract and Identify the Reason for the Change Order.
  2. Create a Change Order Request.
  3. Reach an Agreement About the Change Order Proposal.
  4. Get Approval On the Change Order and Adjust the Contract.
  5. Use a Change Order Log to Keep Track of Change Orders.

FAQ

What is the difference between an addendum and a change order?

A Change Order is used to exchange or modify materials and/or work listed on the Scope for other materials or work. An Addendum is used to add additional work (labor and/or materials) to the Scope.

Why is it important to document contract changes?

The purpose of a change order

It acts as an extension of the contract and ensures that all parties understand their new duties and expectations. It codifies the specific changes the client wants, and provides legal notice of any adjustments to the price and timeline that the client should expect.

What is the difference between change order and change directive?

With change orders, either party will present the other with a proposed change, and then both the owner and the contractor will agree on how to make that change, as well as other adjustments to the price and the schedule. Change directives aren't an agreement or a request to make a change — they're mandatory.

What is the difference between a change order and a CCD?
Change orders are changes in the project timeline or project sum brought on by a change in the project scope. These changes are agreed upon by the contractor, owner, and architect. When the owner and contractor are not able to agree on changes, a CCD can be made by the owner and the architect.

What are the two types of change orders?

There are two main types of change orders in construction. Additive and deductive change orders.

What is a construction change order?

A change order is a document used to alter the original agreement on a construction project. It details the changes in the scope of work, cost, and schedule that are required. In many instances, the construction contract dictates the change order process.

What is the difference between a directive and an order?

A direct order may be written or oral (for example, by telephone). A directive may be implemented for a number of clients when specific conditions are met and when specific circumstances exist. A directive is always written.

What is a ccd in construction

What is a change directive?

A change directive is used to direct the contractor to perform additional work when there is not an agreement between the owner and contractor.

What is a construction change directive AIA?

Construction Change Directives can be used to direct changes in the work which, if not promptly performed, may delay completion of the project. Failure to promptly undertake the changed work may result in a claim or dispute. Typically, a Construction Change Directive is signed by only the owner and architect.

What is the difference between a construction Directive and a change order?

With change orders, either party will present the other with a proposed change, and then both the owner and the contractor will agree on how to make that change, as well as other adjustments to the price and the schedule. Change directives aren't an agreement or a request to make a change — they're mandatory.

What is a construction change Directive AIA?

Construction Change Directives can be used to direct changes in the work which, if not promptly performed, may delay completion of the project. Failure to promptly undertake the changed work may result in a claim or dispute. Typically, a Construction Change Directive is signed by only the owner and architect.

Who issues a construction change directive

Jun 27, 2023 — The owner issues the directive, and the contractor is expected to proceed with the change immediately, without waiting for formal approval or 

What is a ccd in construction

The CCD directs the contractor to make the requested change in lieu of this agreement. In these matters, the architect typically decides what the contractor's 

What is directive changes?

Change Directive means a written order signed by the procurement officer that directs the contractor to suspend work or make changes, as authorized by contract, without the consent of the contractor.

  • What is the difference between a change order and a work change directive?
    • CCDs are provisional instructions issued for immediate implementation, allowing work to proceed while final costs and details are determined. Change Orders, on the other hand, involve a formal process that includes evaluation, negotiation, and contractual modifications.

  • What is the meaning of directive instructions?
    • A directive is an official instruction that is given by someone in authority.

  • What is the difference between a change order and a construction change directive?
    • A change directive or force account work is not the same thing as a change order. A change order requires agreement from the owner and other parties involved. A change directive is used to direct the contractor to perform additional work when there is not an agreement between the owner and contractor.

  • What is the change order clause in construction contract?
    • What is a change order? A change order is a written amendment to an existing contract after the effective date that alters the work, the contract sum, or the contract time. While contracts are intended to be the final word for projects, sometimes things need to change.

  • What are the three categories of change orders?
    • Change orders typically consist of three parts: the project information, the changes to the contract, and the change in cost and time for performance.

  • When to issue a construction change directive
    • A construction change directive (CCD) is effectively a command to a contractor to change their work on the project. When a contractor is given a change 

  • Who submits a change order?
    • A Change Order Request is a proposal issued by the contractor either as a self-initiated claim, or in response to a proposal request, RFI or ASI if, in the Contractor's opinion, the RFI or ASI modifies the scope of the Contract.

Leave A Comment

Fields (*) Mark are Required