What Are One Line Documents in Construction: A Comprehensive Overview

In the construction industry, there are various documents and plans involved to ensure smooth operations. One such important document is the "one line document." This article aims to provide a clear understanding of what one line documents are, their benefits, and the conditions under which they are commonly used.

I. What Are One Line Documents in Construction?

  • Definition: One line documents, also known as single line diagrams, are simplified graphical representations of electrical systems within a construction project.
  • Purpose: They depict the flow of electricity, highlighting the major components, connections, and equipment involved.
  • Clarity and Simplicity: One line documents condense complex electrical systems into a single, easy-to-understand diagram.

II. Benefits of One Line Documents in Construction:

  1. Enhanced Efficiency:

    • Streamlined Communication: One line documents facilitate better communication between architects, engineers, and electricians, ensuring everyone is on the same page.
    • Quick Identification of Issues: With a clear overview of the electrical system, potential problems can be identified and resolved promptly, avoiding delays and costly mistakes.
  2. Safety and Compliance:

    • Accurate Planning: One line documents assist in planning electrical
Here are four main construction contracts to choose from, plus their pros and cons:
  • Lump-Sum Contracts.
  • Cost-Plus-Fee Contracts.
  • Guaranteed Maximum Price Contracts.
  • Unit-Price Contracts.

What are examples of construction documents?

Some common kinds of construction documents include:
  • Bidding documents.
  • Architectural drawings.
  • Schedules.
  • Work orders.
  • Safety reports.
  • Certificates of insurance.
  • Subcontractor applications.

What does line mean in a construction project?

Construction Line means the line with which the projection of the elevation of buildings and/or construction works must coincide, except for roads or streets and engineering and utility networks, excluding balconies, oriels, cornices and other elements of the elevation.

What are the two major parts of construction documents?

Construction Documents: The working drawings and the specifications.

What are the three main contract types used in construction?

3 Types of Construction Contracts: Their Pros and Cons for Owners and Contractors
  • Fixed Price. The most common type of contract is the fixed price contract, also known as the lump sum or stipulated sum contract.
  • Cost-Plus Fee.
  • Unit Price.

Who is solely responsible for preparing the construction documents?

The structural construction documents or reports shall be prepared by a structural engineer. A mechanical or electrical engineer may prepare construction documents or reports for projects where the work is predominately of the kind normally prepared by mechanical or electrical engineers.

Who is responsible for preparing the contract document including the drawings and specifications?

Construction contract documents include the Agreement, the Conditions of Contract, the Drawings, and the Specifications. Because of the legal implications, owners produce the Agreement and the Conditions. Architects are responsible for producing the Drawings and the Specifications.

Frequently Asked Questions

Who is typically responsible for developing bidding documents for construction projects?

The bidding process starts when a project owner or architect advertises that a project is ready for bid and makes the bid documents available to bidders. The bidding process may be facilitated by the owner, an owner's representative or construction manager, or the project architect.

What is a drawing log in construction?

The Drawing Log is used to track all drawings and revisions to these drawings on a project. The Third Party Contractor is responsible for maintaining the official version of this log.

What are the 3 types of blueprints in construction?

Blueprints come in three major varieties: plan view drawings, elevation view drawings, and section view drawings.

What are the abbreviations on blueprints?

Architects commonly abbreviate measurements, such as edge distance (ED), far side (FS), and inner diameter (ID). Materials are also often abbreviated such as gypsum (Gyp.), laminated veneer lumber (L.V.L.), and masonry (Mas.). Items to consider when you read a floor plan are abbreviated, such as not to scale (N.T.S.).

How do you read a construction map?

Here's how you can read construction plans like a pro in five steps.
  1. Read the Title Block.
  2. Go Over the Plan Legend.
  3. Inspect the Drawings.
  4. Determine Orientation.
  5. Look for Any Notes Added.
  6. Conclusion.

What are the 3 main parts of a blueprint?

Blueprints are documents that contain three major elements: the drawing, dimensions, and notes. The drawing illustrates the views of the part necessary to show its features. Together, the extension and dimension lines on the drawing indicate dimensions and specific tolerance information of each feature.

How are construction plans organized?

Drawings are always organized from most general to most specific or specialized. Since plans are most helpful to see the overall design of the project, they come first. Elevations and sections are a bit more specific and come next followed by details and schedules, which are the most specific type of drawings.

What are the details of construction?

In construction, details provide a complete description of a specific part of an object such as a building, bridge, tunnel, machine, component and so on.

How do you read construction details?

Here's how you can read construction plans like a pro in five steps.
  1. Read the Title Block.
  2. Go Over the Plan Legend.
  3. Inspect the Drawings.
  4. Determine Orientation.
  5. Look for Any Notes Added.
  6. Conclusion.

What are the 7 stages of construction?

Here's the process:
  • Step 1: Design. During this phase, the client places a project for bidding.
  • Step 2: Pre-Construction.
  • Step 3: Procurement.
  • Step 4: Construction.
  • Step 5: Commissioning.
  • Step 6: Owner Occupancy.
  • Step 7: Project Closeout.

What order should construction drawings be in?

This organizes the discipline's drawings into a consistent, standard sequence of drawing types.
  • 0 - General (legends, symbols, general notes)
  • 1 - Plans.
  • 2 - Elevations.
  • 3 - Sections.
  • 4 - Large Scale Drawings: plans, elevations, sections.
  • 5 - Details.
  • 6 - Schedules and Diagrams.

What is the most commonly used contract in construction?

Lump sum

Fixed price construction contracts, also commonly referred to as “lump sum” or “stipulated sum” contracts, are the most common types of construction contracts. As its name suggests, under a fixed price contract a contractor agrees to construct a project for a “fixed” or agreed upon price.

What is the main contract in construction?

The 'main contract' is generally that which is awarded by the client (sometimes referred to as the employer) to the general contractor, or main contractor, whose tender has been accepted.

Who are the 3 main parties involved in construction contracts?

In any construction project there are three main parties involved: the owner or client, the management team, and the contractor. The building contractor plans and coordinates construction activities, and must complete the project within the established time and budget.

What are the three most commonly used types of construction contracts?

Though there are several types of construction contracts, some of the most commonly used ones in the industry are:
  • Cost-plus contracts.
  • Lump sum contracts.
  • Unit price contracts.
  • Time and materials contracts.

FAQ

Who is responsible for construction specifications?

Who Handles Construction Specs? Typically, specs are prepared by the architect or designers. Generally, architects will delegate them but oftentimes project engineers will be involved due to their breadth of technical knowledge.

How are construction specifications organized?

Specifications are organized into groups, subgroups, and divisions. Each division is further subdivided into sections, with each section divided into three parts.

What are the methods of carrying out specifications?

Specifications communicate the information required to achieve a desired work result. There are four methods of specifying: performance, descriptive, reference standard, and proprietary.

How do specifications play into the construction document package?

They go together with the plans, which show what needs to be constructed. Specifications include detailed information on what materials should be used, how they should be installed, and the quality of the work. They are organized into sections that describe a small piece of the work on a project.

Is the owner responsible for the specifications?

Warranting the plans and specifications

The owner usually warrants the adequacy of the plans and specifications on many projects and, therefore, bears the responsibility for any defects or deficiencies in them.

What are documents in construction?

All construction documents primarily consist of two things – specifications and drawings as standard inclusions. This standard helps the reader in analysing where to look among hundreds of pages of architectural specifications and drawings.

Which is not a contract document?
Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents.

Which specification is not a part of the contract document?

General specifications

General specifications: General specifications provide a very brief explanation about construction materials and construction work. Generally, Architect mentioned these specifications on a drawing, which helps for estimating the construction work. These specifications are not a part of contract.

What are the 5 elements of a construction contract?
Here are five of the most important terms that should be a part of every construction contract.
  • Scope of Work. Clients need to be clear about what a company is going to do for them.
  • Payment Obligations.
  • Insurance Information.
  • Parties to the Agreement and Notice.
  • Authority to Make Decisions.
Which documents are not part of the project manual?

The project manual contains technical information and other documents related to legal and procedural requirements assembled by the architect or the CM as advisor: The project manual is a bound book containing all contract and non-contract documents, however it does not include the drawings.

What are the terms of reference in construction?

The Terms of Reference (TOR) is a description of the technical work involved in a project, or part of a project. Specifically, it is used to specify the work required by an external consultant, contractor, or supplier.

What is RFI in construction management?

What is Request for Information (RFI) in construction? For most construction projects, the agreement, drawings, and specifications may not address every small aspect of the work. Therefore, when clarification is required, an RFI document is issued which details the additional information required.

What is an RFQ in construction?

Last Updated Oct 18, 2023. In construction, the term RFQ is used to mean both request for qualifications and request for quote. Project owners use a request for qualifications (RFQ) to narrow down a list of contractors to find those who meet the criteria to bid on a specific project.

What is an addenda in construction?
A written document that modifies by adding to, clarifying, or modifying the bidding documents. An addendum is generally issued by the owner to the contractor during the bidding process and is intended to become part of the contract documents when the construction contract is executed.

What are the Terms of Reference requirement?

Terms of reference (TOR) define the purpose and structures of a project, committee, meeting, negotiation, or any similar collection of people who have agreed to work together to accomplish a shared goal. Terms of reference show how the object in question will be defined, developed, and verified.

What are one line documents in construction

What are drawing levels of detail?

LOD (Level of Detail) is the term used to describe how much information a drawing or model contains. Simply put, it is how you choose to show the construction details and materials of a project.

What does the number mean following a page letter in a set of construction drawings? Sheet Sequence Number

The sheet sequence number is a two-digit number that identifies. each sheet in a series of the same discipline and sheet type.

What is a detail drawing in construction?

Detail drawings depict elements shown in other construction drawings on a larger scale. Detail drawings provide more thorough information about the placement of and the connections between different parts. An architect might create detail drawings for: Door frames.

What is the level of design detail?

Level of Design / Development / Detail (LOD) is the overall state of your information model at a particular point in its design process. This includes not only graphical objects, but also the data associated with the objects.

What are the 5 levels of drawing?

Drawing reflects milestones in skill, creativity, emotions, academic growth, and mastery. The five stages of drawing comprise scribbles, lines, shapes, symbols, and detailing.

What type of document tell a construction manager the amount of materials needed?

To keep track of all tools and materials, a bill of quantities is needed. This is essentially an itemized list of all the materials, tools, labor, and parts used on the build. Pricing for each of these items is also included.

What is the use of construction documents?

The purpose of construction documents is to get the design built. These are contract binding documents which describe precisely how the design shall be built: methods, materials, building systems, components.

How do you manage construction documents? How to Streamline and Simplify Construction Document Management
  1. Centralize Your Construction Data. The first step to getting a handle on document management at your organization is to centralize your data and documents.
  2. Make Construction Documents Accessible Anywhere.
  3. Optimize Document Management Workflows.
How do you manage materials on a construction site? 6 Methods Of Managing Material Orders On Site
  1. Procurement.
  2. Time to order.
  3. Materials cost and planning.
  4. Optimising inventory.
  5. Delivery.
  6. Kitting.
What is the most important document on a construction project?

It is acknowledged that the building plans and construction drawings are the most important documents for a construction project. However, there is more to construction documentation than focusing on these plans and drawings.

Where is the door size information found on a blueprint?

Doors may be identified as to size, type, and style, with code numbers placed next to each symbol in a plan view. This code number or mark is then entered on a line in a door schedule, and the principal characteristics of the door are entered in successive columns along the line.

What should be included in the construction documents? It will touch on information such as:
  • Who will complete the work on the project.
  • The scope of work that is going to be done.
  • A full description of the project.
  • Supplier information.
  • Payment information, including who is going to pay for the project.
  • A general schedule and timeline.
  • Provisions for delays.
  • Contractor protections.
What is a door schedule in construction?

Door and window schedules are critical components of an architectural drawing set. They provide an itemized list of all the doors and windows within the project. Door and Window schedules provide a central location for detailed information including head and jamb details or hardware sets.

How do you read a construction document? Here's how you can read construction plans like a pro in five steps.
  1. Read the Title Block.
  2. Go Over the Plan Legend.
  3. Inspect the Drawings.
  4. Determine Orientation.
  5. Look for Any Notes Added.
  6. Conclusion.
How are doors shown on blueprints?

DOORS: Doors are indicated on house plans with a line perpendicular to the wall and with a quarter circle, which shows the swing of the door. The perpendicular line is the side the door is hinged on. A cavity slider or a pocket door is drawn as a door within a wall.

  • What is a form in construction?
    • The term, 'form' can also mean a mould, i.e for holding a liquid or semi-plastic material in a particular shape until it sets. Hence, in construction, formwork is used to create shapes and designs, e.g supporting in-situ concrete until it cures to form walls and floors, etc.

  • What are construction documents?
    • A set of construction documents is a set of drawings that an architect produces during the design development phase of a construction project. They serve as a project manual during the construction phase, and they assist permitting agencies and inspectors from local governments, who have to clear the project.

  • What is project documentation in construction?
    • Whether written or graphic, printed or digital, construction documents define all the requirements of a construction project in detail. This includes everything from bidding documents, drawings, and technical specifications to the construction contract agreement and its various components.

  • What are the 5 types of formwork?
    • Types of Formwork in Construction
      • Timber Formwork.
      • Advantages of using Timber Formwork.
      • Steel Formwork.
      • Advantages of Steel Formwork.
      • Plywood Formwork.
      • Fabric Formwork.
      • Aluminum Formwork.
      • Some advantages of aluminium formwork in construction are:
  • What is in a set of construction drawings?
    • They are the pictorial record of the official design for the building, and generally include detailed depictions of every element of the finished building including the foundation, floor, walls, elevations, interior details and elevations, cabinetry, MEP design, structural details, and ceiling plans.

  • What is considered a full set of plans?
    • A custom set of plans includes a vast amount of detail, including abbreviations, dimensions, styles, and types of materials, ceiling heights, design, and more.

  • What is the first page in a typical set of construction drawings?
    • Cover Page

      Cover sheets provide general project information, such as the project name, team members (owner, designer, engineer, and so on), building type, site map, and the list of drawings in the CD set.

  • What are the abbreviations commonly used on construction drawings?
    • Architects commonly abbreviate measurements, such as edge distance (ED), far side (FS), and inner diameter (ID). Materials are also often abbreviated such as gypsum (Gyp.), laminated veneer lumber (L.V.L.), and masonry (Mas.). Items to consider when you read a floor plan are abbreviated, such as not to scale (N.T.S.).

  • What are the 6 types of construction drawings?
    • Types of Design and Construction Drawings
      • Architectural Drawings.
      • Structural Drawings.
      • HVAC Drawings.
      • Electrical & Plumbing Drawings.
      • Firefighter Drawings.
      • Miscellaneous Drawings.
  • What are the 4 most common construction drawings?
    • Construction drawings usually include a set of working drawings that cover different aspects of the project plan. These drawings usually comprise Elevation drawings, Floor Plans, Sections and Detail Drawings.

  • What are the 5 types of drawings used in building construction?
    • Common types of construction drawings include Architectural Drawings, Structural Drawings, Electrical Drawings, Plumbing and Sanitary Drawings, and Finishing Drawings.

  • What construction abbreviations are commonly used in blueprints?
    • Architects commonly abbreviate measurements, such as edge distance (ED), far side (FS), and inner diameter (ID). Materials are also often abbreviated such as gypsum (Gyp.), laminated veneer lumber (L.V.L.), and masonry (Mas.). Items to consider when you read a floor plan are abbreviated, such as not to scale (N.T.S.).

  • What are the architectural abbreviations?
    • Building and Construction Drawing Abbreviations
      • AFF - Above finished floor.
      • AFG - Above finished grade.
      • BOF - Bottom of footing.
      • BOW - Bottom of wall.
      • BP or B/P - Blueprint.
      • CAD - Computer-aided drafting.
      • DWG - Drawing.
      • Exc - Excavate.
  • What does AFF mean in architectural drawings?
    • Above finished floor

      AFF: Stands for above finished floor. In construction plans and contract documents, AFF refers to an elevation above the finished floor and serves as a benchmark with respect to other dimensions noted above this finished floor height.

  • What is an ASI in construction terms?
    • Architects Supplemental Information (ASI)

      An ASI is a form used by an architect to specify additional instructions and interpretations relating to a set of architectural plans.