Around seven months

Average Time it Takes to Build a Home

According to the 2022 Survey of Construction from the Census Bureau, the average completion time of a single-family home is around seven months.

How long does it realistically take to build a house?

Approximately seven to eight months

Average Time It Takes to Build a House

The average new home building process takes approximately seven to eight months, per the US Census Bureau. This timeframe includes finalizing plans and obtaining permits, the actual construction of the home, and the final walkthrough.

How long does it take to finish a house after framing is done?

Looking at the latest data from the US Census Bureau (2018), the average completion time for a single-family home is almost 8 months, including 30 days from authorization (permitting) to start and 6.7 months from start to completion of the construction.

Why does house construction take so long?

With fewer workers on their crews and the limited inventory of critical supplies, builders have experienced lengthier build times.

What is the quickest house to build?

6 Fastest Construction Methods For Houses
  1. Pole Barn Construction. A pole barn home is built on-site without it being on a foundation.
  2. Modular Construction.
  3. 3D Printing.
  4. Constructing a Home That Uses Only Wireless Technology.
  5. Insulated Concrete Form Building.
  6. PEX Pipe.

How long does it take to build a house from start to finish?

Average Time It Takes to Build a House

The average new home building process takes approximately seven to eight months, per the US Census Bureau. This timeframe includes finalizing plans and obtaining permits, the actual construction of the home, and the final walkthrough.

How long until a house is finished after drywall?

As a builder, the time it takes to finish a house after drywall installation depends on several factors, including project complexity, house size, and finishing level. The finishing process typically includes installing trim, painting, and flooring. A builder can finish drywall in 2-3 weeks if it's properly installed.

Frequently Asked Questions

How long does construction of a house take

You can expect it to take between 9 to 18 months for home construction. That's because a custom house is truly customized to fit your tastes. You work directly 

How long does it usually take to build a building?

The average build time for a new construction in the U.S. was 7.2 months in 2021. But that number can vary widely when you consider the type of house. For a tract or spec house, that time is around 6.5 months, and for a custom house, it averages just over 12 months.

How fast to build a building?

A small home construction project might last up to six months. However, it may be as short as four months or as long as twelve. Spec homes may be built in as little as four to six months, while custom-built homes may take as long as ten to sixteen months.

FAQ

How long does it take to build a 10000 square foot house?

A general rule of thumb is 10 months to 2 years, for construction of a true custom home. It might be possible to complete a semi-custom home project in 6-8 months (with a great team and good luck) but for a fully customized home, it's safe to assume that the build will require at least 10 months.

How long does it take to build 100 houses?

Each person can (on average) build one house in five days. So five people can each build one house in those same five days (five houses total). And 100 people can each build one house in those same five days (100 houses total).

How long does new construction take

Is it cheaper to buy a house or build it?

Overall, it's cheaper to build a home than to buy one in California, with 13 out of the 20 counties saving you money if you decide to build your house from scratch. Budget-wise, building is more favorable in Southern California whereas Central California caters best to those interested in buying.

How long does it take to build a 10000 sq ft home?

A general rule of thumb is 10 months to 2 years, for construction of a true custom home. It might be possible to complete a semi-custom home project in 6-8 months (with a great team and good luck) but for a fully customized home, it's safe to assume that the build will require at least 10 months.

  • How long does it typically take to build a new home?
    • The average build time for a new construction in the U.S. was 7.2 months in 2021. But that number can vary widely when you consider the type of house. For a tract or spec house, that time is around 6.5 months, and for a custom house, it averages just over 12 months.

  • How long does it take for a new construction home to be built
    • Jun 8, 2020 — The average amount of time to build a new construction house is about 7.7 months, according to data from the U.S. Census Bureau's 2018 Survey of 